Start with the requirement
A dose is decaying. The plan starts at the receiving window.
Tell us three things and we will come back with a lane.

- The lane
- Origin and destination, including the receiving dock, the hot lab and who signs.
- The shipment
- Isotope, package type and handling requirements. Transport index and any applicable limits are confirmed at booking, in writing.
- The timing
- Delivery window with time zone, and whether the movement is one-time or a standing lane.
Your next shipment
Request a lane quote
Tell us where it needs to go and when it needs to arrive.
All fields are required except notes.
This form starts the lane design. Acceptance of a shipment and each operational decision rest with the qualified, authorized personnel the regulations designate, and they are named on your record.
